XLXL テクノロジー
All cases

小売・店舗

Street-facing retail flagship

A film screen bonded to existing shop glass, keeping the interior visible during trading and turning the frontage into a moving brand surface after dark.

Reference project. Client details, location and final project data are available on request.

Street-facing retail flagship
Application
小売・店舗
Environment
Existing glass, street level
Site type
Street-level shopfront
Suggested viewing
3–8 m from the pavement
Service route
Front service from inside the shop

The challenge

The storefront had a single glazed frontage with no space for a cabinet frame. The brand wanted motion at street level without blocking the window display or reducing daylight.

Why this format

Film was selected over a framed transparent panel because the shopfront had no depth for a cabinet and the brand wanted the glass to stay visually open during the day.

ピクセルピッチ
P4–8
透明性
65%
明るさ
5,000 ニト
防塵防水等級
IP43

The approach

  • Surveyed the glass build and confirmed a film panel layout that follows the existing mullions.
  • Routed power and signal through the head detail to keep the frame line clean.
  • Set a content brief for short, high-contrast loops that read from across the street.

Result

The glazing stays open during trading hours and becomes the main brand surface at night. Film sections can be replaced without removing the shopfront.

Integration plan

The physical interface between the screen, the building and the service route decides how the installation performs after handover.

  • Panel layout follows the existing mullions and glass joints.
  • Power and signal are routed through the head detail to keep the frame line clean.
  • The controller sits inside the shop, away from the window display.

Content and operation

A screen is only as useful as its daily routine. Content rhythm, brightness and spare parts are agreed before the first playlist goes live.

  • Short, high-contrast loops built for street-level dwell time.
  • Separate brightness settings for trading hours and after-hours.
  • Spare film sections kept for panel-level replacement.

What this study shows

01

Film keeps the glass line and interior view intact.

02

At street distance, content contrast matters more than pixel count.

03

Service access must be agreed with the shop before installation.

Installation notes

The mounting and service route were agreed before the screen layout was fixed.

XLC フィルムシリーズ specifications
  • 接着、剥離前にガラス表面を洗浄・調整しました
  • 電源と信号は隠しエッジ接続を介して配線されます
  • 起動前に平面度とエッジクリアランスを確認しました

Project views

Installation views and format details. Reference study.

Street-facing retail flagship detailStreet-facing retail flagship detail

Plan a project with this format

Share the site, viewing distance and target date. We will confirm whether the same approach applies to your building or venue.

jasmin@xlled.cn

月曜日から金曜日、09:00 から 18:00 (GMT+8)

この問い合わせを送信すると、プロジェクトに関する連絡を受け入れることに同意したものとみなされます。当社はプロジェクト情報を第三者と共有しません。